Dina Farms            
About Us Export Investors Contact Us
- Introduction
- Fruits
- Vegetables
- Crops
- Organic
- Miscellaneous
- Introduction
- Milk Production
- Meat Production
- Introduction
- Dairy Products
- Milk Powder
- Misc.
- Sport & Touristic Activities
[ Who we are |  History |  Vision |  Mission |  Location ]

About Us

Quality Management
Research & Development
Infra Structure
Media News
Organization
Board Members

Infra Structure
  • For the water supply 78 deep wells were drilled to pump water from the underground reservoir.
  • For irrigation 43 center pivots sprinkling systems were used for the arable open fields while drip irrigation was used for trees and vegetable fields.
  • For energy, private power stations were built to generate power required to run the project with a capacity of 10 Megawatts that will lately be used as a backup for the current entrance of the Government's electricity.
  • For power distribution 55 Km of medium tension transmission lines run all over the farm to supply the required electricity.in addition to the government electricity currently working on project.
  • For transportation 75 Km of roads, 24 Km asphalt paved and 51 Km dirt roads were built.
  • For communication a telephone network system was setup.
  • For maintenance purposes a very well equipped central workshop was setup to maintain the big range of farm equipment.
  • Packing Facilities: A Packing plant of a daily capacity of 40 tons per day.

A 2.5 Km facade on the Cairo-Alexandria road with a depth of half a kilometer (total area of 300 acres) ideal for futuristic investments in the fields of Tourism, Trade and Economic businesses. 


Mireless Power Station

 

 




All Materials Copyright © 2001 Dina for Agriculture Investments Company. All Rights Reserved